Home> Blog> Steel structure building Steel structure construction

Steel structure building Steel structure construction

July 13, 2022

1) Construction set-out


a. According to the design requirements and drawing requirements, and in accordance with the actual situation, the elevation and axis should be verified for accuracy.


b. Before construction, the theodolite should be used to match the axis, and the level should be used to determine the elevation. Also, make some records accordingly.


c. After determining the axis and elevation, put the large sample, and then put the small sample, the order cannot be reversed.


d. When positioning the rigid frame, try to avoid the collision between the rigid frame column foot and the bolt, so as not to deform or damage the bolt.


(2) Pre-embedded bolts in foundation concrete


a. Before the foundation concrete, check the size, length, elevation, and position of the bolts, and fix the embedded bolts.


b. After the foundation concrete is poured, it is necessary to clean up the residual concrete in time.


c. When pouring concrete, the positioning of the embedded bolts should be accurate to avoid changes in their displacement and elevation.


application



Contact Us

Author:

Mr. Sean

Phone/WhatsApp:

+8615335317863

Popular Products
You may also like
Related Information
The application of steel structure

1. Large-scale workshop steel structure. Under normal circumstances, workshops with large cranes or heavy operations will use this steel structure, such as open hearth, converter workshop, iron...

Building Steel structure Steel structure grid

There are certain requirements for each steel structure grid used in grid engineering. Usually, steel structure grids have special or higher requirements in the following aspects. Haiyao Xiaobian...

Advantages of steel structure building

Steel structure engineering mainly includes grid structure, suspension cable structure and reticulated shell structure, etc., which are used for roof structures such as gymnasiums, waiting halls,...

Construction method of steel structure workshop

Steel structure workshop has short construction period: The construction part of the steel structure workshop is mainly prefabricated in the factory, and the installation is stopped after being...

Related Categories

Email to this supplier

Subject:
Email:
Message:

Your message must be betwwen 20-8000 characters

Contact Us

Author:

Mr. Sean

Phone/WhatsApp:

+8615335317863

Popular Products
Related Products List

Home

Product

Phone

About Us

Inquiry

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send